RUSH 242

RUSH 242 - Crossfit Gym
Manchester
Layrd Design completed this interior design and build scheme in June 2023. We designed this new Cross fit gym in a shell space under residential units. The client wanted an industrial space with hints of their bold brand colours and training ethos throughout.
We paired OSB with the painted concrete and block walls to add warmth and pull in the traditional look of cross fit gym spaces but with a new look.
Feature LED strip lighting is located though out the space as well as a bespoke OSB reception desk.

Year Completed:
2023
Project Length:
20 Weeks
Location:
MANCHESTER
Services:
INTERIOR DESIGN &
BUILD
Project Size:
60 Sqm

FUNCTIONAL
INDUSTRIAL DESIGN
COLOUR

"Working with Layrd was a pleasure from first contact to the end of our project. They went above and beyond to ensure that our vision for the space became reality. Gina was a great fit from day one, she did her research into our industry and understood where we wanted to take things.
We came up against many unexpected obstacles along the way but Gina and the team were always able to assist and guide the project back on track. We would 100% recommend their services to anyone who asked!"
Rush 242 - Manchester